Every roadworks site Auckland Transport has a permit for, as at —.
— cones shown
All published organisations
One cone is one permitted worksite, not a cone. Nobody publishes cone counts, including Auckland Transport — these are worksites. Height is days since the contractor’s own logged start date (2.0 m per day, on a 25 m base so every site is visible). Colour is permit status. Nothing else is encoded.
Source: Auckland Transport’s public roadworks feed, captured daily and archived here since 9 September 2026 (1 day so far). Figures are AT’s own, unedited. Past-end-date report →
Built in personal time, from Auckland Transport's public open data. My own project, not AT's, and not written on AT's behalf.
Each day is one captured copy of Auckland Transport’s public roadworks feed. The timeline compares that day’s published records with the previous captured day, using the worksite code.
ProjectEndDate became later. This is a change in the public feed, not proof of a legal WAP or TMP extension.ProjectEndDate was earlier than the capture date. It is not a finding of an expired permit, non-compliance, or an active site.What this is for: preserving a day-by-day public record and showing what changed in that published feed. It cannot show the full TMP, its conditions, later variations, the reason a record changed, or what is physically on the road.
The archive is still being checked against Auckland Transport’s documentation. Do not use these categories to confront contractors or as an enforcement finding.